Skip to content
Sakneen
Menu

Guide

How to measure absorption properly

Absorption is units contracted in a period as a share of units released and available in that period. Almost every disagreement about absorption is definitional — what counts as sold, what counts as released, and over what period — so the definition must be fixed before the number is useful.

The four choices that decide your number

Definitional choices in an absorption calculation
ChoiceOptionsEffect
What counts as soldReservation, contract, or paid down paymentReservations inflate the rate; cancellations arrive later
What counts as availableAll project units, released units, or actively marketed unitsThe narrower the denominator, the higher the rate
PeriodMonthly, quarterly, since releaseMonthly is operational; quarterly is reportable; since-release hides the trend
SegmentWhole project, phase, unit type, price bandProject-level absorption hides the phase that has stopped selling

The reading that matters

A single absorption number tells you almost nothing. The comparison that drives decisions is absorption of this phase against its own plan, and against the previous phase at the same point after release. That is what separates a slow month from a pricing problem.

Segment it by unit type before concluding anything. It is common for a project at a healthy overall rate to have one unit type absorbing almost nothing — which is a mix problem, not a price problem, and a price cut would be the wrong response.

Acting on it

Above plan and accelerating: the release is underpriced or too small — raise price on the next tranche rather than the current one. Below plan with high traffic and low conversion: price or plan is wrong at that point. Below plan with low traffic: it is a demand or positioning problem, and discounting will not fix it.

Frequently asked questions

Should cancellations be netted off?
Yes, in the period they occur, and the gross and net figures should both be visible. A rate reported gross of cancellations is systematically optimistic.
How do we compare absorption with other developers?
Carefully, or not at all. Published figures rarely state their denominator, and without it the comparison is not meaningful.

Related

See it against your own inventory

Bring one project. We load its masterplan and unit list, and you see your own homes as digital records before you decide anything.